YD/T 3267-2017
不同运营商的IMS网络和电路交换网、软交换网络互通技术要求
Technical Requirements for interworking between IMS networks and Switched circuit networks, softswitch networks of different operators
2017-07-07
YD/T 1879-2009
软交换互通系列互通设备技术要求
Technical Requirements of Interworking devices for Softswitch Network
2009-06-15
YDC 045-2007
基于软交换的网络组网总体技术要求
General Technical Requirements of Networking Based on Softswitch
2007-03-16
YD/T 1881-2009
不同运营商软交换网络之间互通的协议技术要求
The Technical Requirement of Protocal between Different Operator's Softswitch Network
2009-06-15
YD/T 2426-2012
不同运营商软交换网络之间互通的总体技术要求
General technical requirements of interworking between different operators softswitch network
2012-12-28
YD/T 1928.1-2009
软交换网网络管理技术要求 第1部分:总体技术要求
Softswitch Network Management System Technical Specification Part 1:General Technical Requirements
2009-06-15
YD/T 3469-2019
移动通信网电路域通信管制技术要求
Technical Requirements of Telecommunication Control for Mobile Communication Network Circuit Switching Domain
2019-08-27
YD/T 1522.4-2009
会话初始协议(SIP)技术要求 第4部分:基于软交换网络呼叫控制的SIP协议
Technical Requirements for Session Initiation Protocol Part4 SIP's Applications about call control Based on Softswitch Network
2009-06-15
GB/T 41267-2022
网络关键设备安全技术要求 交换机设备
Security technical requirements for critical network devices—Switch
2022-03-09
ITU-T Y.1271
Framework(s) on network requirements and capabilities to support emergency telecommunications over evolving circuit-switched and packet-switched networks
在不断发展的电路交换和分组交换网络上支持应急电信的网络需求和能力框架
2004-10-14
YD/T 1792.1-2008
2GHz WCDMA数字蜂窝移动通信网网络管理技术要求(第二阶段) 第1部分:基于软交换的配置网络资源模型
Network Management Technical Requirements for 2GHz WCDMA Digital Cellular Mobile Communication Network (Phase Ⅱ)Phase 1:Softswitch-Based Configuration Network Resource Model
2008-03-28
GB/T 21645.3-2009
自动交换光网络(ASON)技术要求 第3部分:数据通信网(DCN)
Technical requirements for automatically switched optical network - Part 3: Data communication network
2009-09-30
GB/T 21645.4-2010
自动交换光网络(ASON)技术要求 第4部分:信令技术
Technical requirements for automatically switched optical network - Part 4:Technical specification of signalling
2010-12-01
GB/T 21645.8-2012
自动交换光网络(ASON)技术要求 第8部分:路由
Technical requirements for automatically switched optical network - Part 8: Routing
2012-06-29
GB/T 21645.5-2012
自动交换光网络(ASON)技术要求 第5部分:用户-网络接口(UNI)
Technical requirements for automatically switched optical network - Part 5: User-Network Interface(UNI)
2012-06-29
GB/T 21645.1-2008
自动交换光网络(ASON)技术要求 第1部分: 体系结构与总体要求
Technical requirements for Automatically Switched Optical Network - Part 1: Architecture and general requirements
2008-04-10
GB/T 21645.7-2010
自动交换光网络(ASON)技术要求 第7部分:自动发现
Technical requirements for automatically switched optical network -Part 7: Automatic discovery
2010-12-01
GB/T 21645.6-2009
自动交换光网络(ASON)技术要求 第6部分:管理平面
Technical requirements for automatically switched optical network - Part 6: Management plane
2009-09-30
GB/T 21645.2-2010
自动交换光网络(ASON)技术要求 第2部分:术语和定义
Technical requirements for automatically switched optical networks - Part 2:Terms and definitions
2010-12-01
GB/T 21645.9-2012
自动交换光网络(ASON)技术要求 第9部分:外部网络-网络接口(E-NNI)
Technical requirements for automatically switched optical network (ASON) - Part 9: External network to network interface(E-NNI)
2012-12-31