电阻焊水冷次级连接电缆 第2部分 单芯连接电缆的规格和技术要求
Water-cooling secondary connection cables for resistance welding Part 2: Specification and technical requirement for single-core connection cables
1996-09-03
JB/T 8442.1-1996
电阻焊水冷次级连接电缆 第1部分 双芯连接电缆的规格和技术要求
Water-cooling secondary connection cables for resistance welding Part 1: Specification and technical requirement for twin-core connection cables
1996-09-03
KS C ISO 8205-2
저항 용접용 수랭식 보조 연결 케이블-제2부:단일 도체 연결 케이블에 대한 치수와 요구 사항
电阻焊水冷二次连接电缆第2部分:单芯连接电缆的尺寸和要求
2016-12-19
KS C ISO 8205-2(2021 Confirm)
저항 용접용 수랭식 보조 연결 케이블-제2부:단일 도체 연결 케이블에 대한 치수와 요구 사항
电阻焊水冷二次连接电缆第2部分:单芯连接电缆的尺寸和要求
2016-12-19
UNE-EN ISO 8205-2-2003
Water-cooled secondary connection cables for resistance welding. Part 2: Dimensions and requirements for single-conductor connection cables. (ISO 8205-2:2002)
电阻焊用水冷二次连接电缆 第2部分:单芯连接电缆的尺寸和要求 (ISO 8205-2-2002)
2003-03-07
GB/T 13632.2-2006
监督压水堆堆芯充分冷却的测量要求 第2部分:冷停堆期间监测仪表的要求
Measurements for monitoring adequate cooling within the core of pressurized light water reactors Part 2: Instrumentation requirements during cold shutdown
2006-03-02
NB/T 20560.3-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第3部分:上游分析技术要求
Design and performance evaluation of emergency core cooling stainer for pressurized water reactors nuclear power plants—Part 3: Technical requirements for upstream effects analysis
2021-04-26
AS 4747.2-2013
Meters for non-urban water supply, Part 2: Technical requirements for closed conduit meters fully charged
非城市供水用水表第2部分:完全充电的封闭管道水表的技术要求
2013-02-21
NB/T 20560.7-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第7部分:下游效应(堆芯内)试验技术要求
Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant—Part 7: Technical requirements for downstream(in-vessel) effects test