油气管道仪表及自动化系统运行技术规范
Specification of running technology for the instrument and automatic system of the oil and gas pipeline
2020-10-23
DIN VDE 0119-207-7-DRAFT
Draft Document - State of the railway vehicles - Control and instrumentation technology - Part 207-7: On-board equipment - LZB (continuous automatic train-running control)
文件草案——铁路车辆状态——控制和仪表技术——第207-7部分:车载设备——LZB(连续自动列车运行控制)
2010-09-01
DIN VDE 0119-207-6-DRAFT
Draft Document - State of the railway vehicles - Control and instrumentation technology - Part 207-6: On-board equipment - PZB (intermittent automatic train-running control)
文件草案——铁路车辆状态——控制和仪表技术——第207-6部分:车载设备——PZB(间歇式自动列车运行控制)
2010-09-01
DIN VDE 0119-207-7
State of the railway vehicles - Control and instrumentation technology - Part 207-7: On-board equipment - LZB 80 / I 80 (continuous automatic train-running control)
铁路车辆状态控制和仪表技术第207-7部分:车载设备LZB 80/I 80(连续自动列车运行控制)
2004-04-01
DIN VDE 0119-207-6
State of the railway vehicles - Control and instrumentation technology - Part 207-6: On-board equipment - PZB-Indusi (intermittent automatic train-running control / inductive train protection)
铁路车辆状态.控制和仪表技术.第207-6部分:车载设备.PZB Indusi(间歇式自动列车运行控制/感应式列车保护)