架空输电线路大跨越工程跨越塔组立施工工艺导则(附条文说明)架空输电线路大跨越工程跨越塔组立施工工艺导则(附条文说明)Construction technology guide for the assembly and erection of the steel towers of large crossing of overhead transmission line
本导则适用于 220kV 及以上架空输电线路大跨越工程全高在 100m 及以上的自立式钢结构跨越塔组立施工
相似标准/计划/法规
DL/T 5287-2013
±800kV架空输电线路铁塔组立施工工艺导则(附条文说明)
Construction technology guide for the assembly and erection of the steel towers of ±800kV overhead transmission line
2013-03-07
DL/T 5289-2013
1000kV架空输电线路铁塔组立施工工艺导则(附条文说明)
Construction technology guide to the assembly and erection of the steel towers of 1000kV overhead transmission line
2013-03-07
DL/T 5342-2018
110kV~750kV架空输电线路铁塔组立施工工艺导则
Construction technology guidance for the assembling and erection of the steel towers of 110kV~750kV overhead transmission line
2018-04-03
DL/T 5276-2012
±800kV及以下换流站母线、跳线施工工艺导则(附条文说明)
Construction technology guide for the assembling of busbar and jumper in converter station at ±800kV and below