现行 DL/T 5095-2013
火电厂和核电厂常规岛主厂房荷载设计技术规程 火电厂和核电厂常规岛主厂房荷载设计技术规程 Technical code for design load of main building in fossil-fired power plant and the conventional island of nuclear power plant
发布日期:2013-11-28
实施日期:2014-04-01
分类信息
研制信息

归口单位: 能源行业发电设计技术委员会

起草单位: 中国电力工程顾问集团西南电力设计院、 中国电力工程顾问集团华东电力设计院

起草人: 陈其春、 鄢明章

标准简介

本规程适用于单机容量为125MW-1000MW级新建或改建、扩建火电厂主厂房自士0.OOm地面或地下室至屋面间的各工艺专业及土建专业的荷载值确定。本规程适用于单机容量为1000MW级核电厂常规岛主厂房自士0.OOm地面或地下室至屋面间的各工艺专业及土建专业的荷载值确定

相似标准/计划/法规
DL/T 5153-2014
火力发电厂厂用电设计技术规程(附条文说明)
Technical code for the design of auxiliary power system of fossil-fired power plant
2014-10-15
DL/T 5240-2010
火力发电厂燃烧系统设计计算技术规程(附条文说明)
Technical code for design and calculation of combustion system of fossil-fired power plant
2010-05-24
DL/T 5142-2012
火力发电厂除灰设计技术规程(附条文说明)
Technical code for the design of ash handling system of fossil-fired power plant
2012-08-23
DL/T 5145-2012
火力发电厂制粉系统设计计算技术规定(附条文说明)
Technical code for design and calculations of coal pulverizing system of fossil-fired power plant
2012-08-23
DL/T 5136-2012
火力发电厂、变电站二次接线设计技术规程
Technical code for the design of electrical secondary wiring in fossil-fired power plants and substations
2012-11-09
DL/T 5455-2012
火力发电厂热工电源及气源系统设计技术规程
Technical code for the design of power supply and air supply system of instrumentation & control in fossil-fired power plant
2012-08-23
DL/T 5187.1-2016
火力发电厂运煤设计技术规程 第1部分:运煤系统(附条文说明)
Technical code for designing coal handling fossil fired power plant Part 1:Coal handling system
2016-08-16
DL/T 5187.2-2019
火力发电厂运煤设计技术规程 第2部分:煤尘防治(附条文说明)
Technical Code for designing coal handling of fossil fired power plant Part 2: Dust prevention and control
2019-11-04
DL/T 5490-2014
500kV交流海底电缆线路设计技术规程
Technical code for design of inlet flow passage of circulating water pump house of fossil-fired power plant
2014-06-29
DL/T 5489-2014
火力发电厂循环水泵房进水流道设计规范
Technical code for design of inlet flow passage of circulating water pump house of fossil-fired power plant
2014-06-29
DL/T 5187.3-2012
火力发电厂运煤设计技术规程第3部分:运煤自动化
Technical code for the design of coal handling fossil-fired power plant Part 3:Coal handling automation system
2012-01-04
设计核电厂荷载火电厂岛主

最后更新时间 2025-09-02