JC/T 2324-2015
蒸压加气混凝土设备 分掰机
AAC equipment separator
2015-07-14
JC/T 2323-2015
蒸压加气混凝土设备 浇注搅拌机
AAC equipment pouring mixer
2015-07-14
BS G 198-5-1997
Sleeves and moulded components for aircraft electric cables and equipment wires-Specification for heat shrinkable moulded shapes
飞机电缆和设备电线用套管和模制部件
2005-11-16
JB/T 12923-2016
建筑施工机械与设备 砌块成型机模具
Building construction machinery and equipment-Mould for producing concrete block
2016-10-22
BS 3G 100-2.3.3-1972
Specification for general requirements for equipment for use in aircraft. All equipment. Environmental conditions-Mould growth
飞机用设备的一般要求规范 所有设备 环境条件
1972-03-21
UNE-EN 710-1998
SAFETY REQUIREMENTS FOR FOUNDRY MOULDING AND COREMAKING MACHINERY AND PLANT AND ASSOCIATED EQUIPMENT.
铸造成型和制芯机械、装置及相关设备的安全要求
1998-06-23
UNE-EN 12890-2001
Founding. Patterns, pattern equipment and coreboxes for the production of sand moulds and cores.
成立的用于生产砂型和型芯的模具、模具设备和型芯盒
2001-06-21
CB/T 4389.7-2013
船舶设备环境参数测量方法 第7部分:霉菌
Method for measuring environmental parameters for ship equipment — Part 7:Mould
2013-12-31
GB/T 42156-2023
铸造砂型3D打印设备 通用技术规范
3D printing equipment for casting sand mould—General technical specification
2023-03-17
BS EN 12890-2000
Founding. Patterns, pattern equipment and coreboxes for the production of sand moulds and sand cores
成立的用于生产砂型和砂芯的模型、模型设备和芯盒
2000-06-15
GOST 27713-1988
Литейное оборудование. Машины для литья в кокиль. Присоединительные размеры крепления кокилей
铸造设备 用于铸造冷却模具的机器 冷却固定的安装尺寸
GOST 26080-1984
Радиоэлектронная аппаратура и изделия электронной техники. Общие требования к защите от воздействия плесневых грибов
模具真菌保护放射性电子设备和电子技术制品 一般要求
BS EN 60512-11-5-2002
Connectors for electronic equipment. Tests and measurements. Climatic tests-Test 11e. Mould growth
电子设备用连接器 测试和测量 气候试验
2002-05-27
UNE-EN 12107-1998
PLASTICS PIPING SYSTEMS. INJECTION-MOULDED THERMOPLASTICS FITTINGS, VALVES AND ANCILLARY EQUIPMENT. DETERMINATION OF THE LONG-TERM HYDROSTATIC STRENGTH OF THERMOPLASTICS MATERIALS FOR INJECTION MOULDING OF PIPING COMPONENTS.
塑料管道系统 注塑热塑性塑料配件、阀门和辅助设备 管道部件注射成型用热塑性材料长期静水压强度的测定
1998-05-07
BS EN 12107-1998
Plastics piping systems. Injection-moulded thermoplastics fittings, valves and ancillary equipment. Determination of the long-term hydrostatic strength of thermoplastics materials for injection moulding of piping components
塑料管道系统 注塑热塑性塑料配件、阀门和辅助设备 管道部件注射成型用热塑性材料长期静水压强度的测定
1998-03-15
UNE-EN 60512-11-5-2002
Connectors for electronic equipment - Tests and measurements -- Part 11-5: Climatic tests - Test 11e: Mould growth.
电子设备连接器.试验和测量.第11-5部分:气候试验.试验11e:霉菌生长
2002-12-16
JIS C 5402-11-5-2005
Connectors for electronic equipment -- Tests and measurements -- Part 11-5: Climatic tests -- Test 11e: Mould growth
电子设备连接器试验和测量第11-5部分:气候试验试验11e:霉菌生长
2005-01-01
BS EN 60664-3-2017
Insulation coordination for equipment within low-voltage systems-Use of coating, potting or moulding for protection against pollution
低压系统内设备的绝缘协调
2017-10-18
IEC 60512-11-5-2002
Connectors for electronic equipment - Tests and measurements - Part 11-5: Climatic tests - Test 11e: Mould growth
电子设备连接器 - 测试和测量 - 第11-5部分:气候测试 - 测试11E:模具生长
2002-02-21
BS 4G 198-3-1999
Sleeves and moulded components for aircraft electric cables and equipment wires-Specification for heat-shrinkable sleeving for binding, insulation, and identification
飞机电缆和设备电线用套管和模制部件
1999-12-15