现行 NB/T 20340-2015
核电厂核岛被动防火保护结构安装及验收技术规程 核电厂核岛被动防火保护结构安装及验收技术规程 Technical specification for installation and acceptance of passive fire protection structure of PWR nuclear power plant
发布日期:2015-04-02
实施日期:2015-09-01
分类信息
研制信息

归口单位: 核工业标准化研究所

起草单位: 中广核工程有限公司、 烟台金润消防工程有限公司、 喜利得(中国)商贸有限公司

起草人: 杨舒亮、 苏俊平、 鹿德富

标准简介

本标准规定了核电厂核岛被动防火保护结构的安装及施工验收要求。本标准适用于核电厂核岛被动防火保护结构的安装及施工验收

相似标准/计划/法规
NB/T 20377-2016
非能动压水堆核电厂蒸汽发生器安装技术规程
Technical Specification for Installation of Passive PWR Steam Generator
2016-02-05
NB/T 20392-2016
非能动压水堆核电厂反应堆压力容器安装及验收技术规程
Technical regulation for construction and acceptance of reactor vessel installation in passive PWR nuclear power plant
2016-02-05
YD 5014-1995
数字复用设备安装工程施工及验收技术规范(PDH)部分
Technical specification of digital multiplxer equipment installation and acceptance
YD 5011-1995
电报,传真设备安装工程施工及验收技术规范
Technical Specification for Construction and Acceptance of Telegraph &. Fax Equipment Installation Project
JB/T 11391-2013
燃煤电厂袋式除尘器用滤袋安装技术要求与验收规范
Technical requirement and acceptance specification for filter bag installation in coal-fired power plants
2013-04-25
T/CMA SB 005-2014
有线远传水表自动抄表系统工程施工、验收技术规范
Remote Wire Transmission Water Meter Auto Reading System Installation & Acceptance Technical Specification
2014-10-31
NB/T 20502-2018
压水堆核电厂人员闸门、设备闸门安装及验收技术规程
Technical specification for installation and acceptance of personnel airlock and equipment hatch in PWR nuclear power plant
2018-03-22
NB/T 20457-2017
非能动压水堆核电厂钢制安全壳部件制造及质量验收规程
Technical specification for steel containment vessel components manufacturing and acceptance in passive pressurized water reactor nuclear power plant
2017-04-01
HJ 655-2013
环境空气颗粒物(PM10和PM2.5)连续自动监测系统安装和验收技术规范
Technical specifications for installation and acceptance of ambient air quality continuous automated monitoring system for PM10 and PM2.5
2013-07-30
HJ 193-2013
环境空气气态污染物(SO2、NO2、O3、CO)连续自动监测系统安装和验收技术规范
Technical specifications for installation and acceptance of ambient air quality continuous automated monitoring system for SO2,NO2,O3 and CO
2013-07-30
结构防火核电厂验收被动