DL/T 5113.1-2019
水电水利基本建设工程单元工程质量等级评定标准 第1部分:土建工程(附条文说明)
Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering -Part l: Civil engineering
2019-06-04
DL/T 5113.3-2012
水电水利基本建设工程 单元工程质量等级评定标准 第3部分:水轮发电机组安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering. Part 3:Turbine and generator units installation engineering
2012-01-04
YS/T 5419-2013
有色金属工业安装工程质量检验评定统一标准(附条文说明)
Unified standards for constructional quality inspection and assessment of nonferrous metal insustrial installation engineering
2013-10-17
SL 636-2012
水利水电工程单元工程施工质量验收评定标准-水轮发电机组安装工程(附条文说明)
Inspection and assessment standard for separated item project construction quality of water conservancy and hydroelectric engineering-Installation of hydraulic turbine generator units
2012-09-19
DL/T 5113.9-2017
水电水利基本建设工程单元工程质量等级评定标准 第9部分:土工合成材料应用工程
Quality grade evaluation standard of unit engineering forhydropower and water resources construction engineeringPart9:Geosynthetics application engineering
2017-11-15
DL/T 5113.11-2005
水电水利基本建设工程 单元工程质量等级评定标准 第11部分:灯泡贯流式水轮发电机组安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11: Bulb turbine and generator units installation engineering
2005-11-28
DL/T 5113.5-2012
水电水利基本建设工程 单元工程质量等级评定标准 第5部分:发电电气设备安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 5:Electric generation equipment installation enginering
2012-01-04
DL/T 5113.8-2012
水电水利基本建设工程单元工程质量等级评定标准 第8部分:水工碾压混凝土工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 8:Hydraulic roller compacted concrete enginering
2012-04-06
DL/T 5113.4-2012
水电水利基本建设工程 单元工程质量等级评定标准 第4部分:水力机械辅助设备安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 4:Auxiliary equipment of hydraulic machinery installation engineering
2012-01-04
DL/T 5113.6-2012
水电水利基本建设工程 单元工程质量等级评定标准 第6部分:升压变电电气设备安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering. Part 6:Step-up substation electrical equipment installation engineering
2012-01-04
SL 635-2012
水利水电单元工程施工质量验收评定标准——水工金属结构工程
Inspection and assessment standard for separated item project construction quality of water conservancy and hydroelectric engineering -- Installation of metal structures
2012-09-19
SL 638-2013
水利水电工程单元工程施工质量验收评定标准——发电电气设备安装工程
Inspection and assessment standard for separated item project construction quality of water conservancy and hydroelectric engineering -- Installation of Electrical power generation equipment
2013-08-08
SL 639-2013
水利水电工程单元工程施工质量验收评定标准——升压变电电气设备安装工程
Inspection and assessment standard for separated item project construction quality of water conservancy and hydroelectric engineering -- Installation of Step-up substation electrical equipment
2013-08-08
SL 637-2012
水利水电单元工程施工质量验收评定标准——水利机械辅助设备系统安装工程
Inspection and assessment standard for separated item project construction quality of water conservancy and hydroelectric engineering -- Installation of hydraulic mechanical auxiliary equipment system
2012-09-19