NB/T 20477.3-2018
核电厂用爆破阀 第3部分:驱动装置设计
Squib valve for nuclear power plant-Part 3:Specification for cartridge
2018-03-22
NB/T 20477.4-2018
核电厂用爆破阀 第4部分:驱动装置鉴定
Squib valve for nuclear power plant-Part 4:Cartridge qualiflcation
2018-03-22
NB/T 20477.1-2018
核电厂用爆破阀 第1部分:阀门设计
Squib valve for nuclear power plan-Part 1:Valve design
2018-03-22
NB/T 20093-2012
核电厂安全级阀门驱动装置的鉴定
Qualification of safety-related valve actuators for nuclear power plants
2012-01-06
NB/T 20206-2013
核电厂安全级阀门驱动装置用电磁阀鉴定规程
Qualification test specification of safety related solenoid valves for valves actuators for nuclear power plants
2013-06-08
NB/T 20168-2012
压水堆核电厂止回阀鉴定规程
Qualification procedure for check valve of pressurized water reactor nuclear power plants
2012-10-19
NB/T 20288-2014
核电厂安全级阀门位置开关鉴定规则
Qualification procedure for safety class valve position switch of nuclear power plants
2014-06-29
NB/T 20167-2012
压水堆核电厂隔离阀鉴定规程
Qualification procedure for isolation valve of pressurized water reactor nuclear power plants
2012-10-19
NB/T 20010.13-2010
压水堆核电厂阀门 第13部分:核用非核级阀门技术条件
PWR nuclear power plant valve—Part 13:Specification of non classified valve for nuclear device
2010-05-24
NB/T 20036.6-2011
核电厂能动机械设备鉴定 第6部分:阀门组件鉴定
Qualification of active mechanical equipment used in nuclear power plants. Part 6:Functional qualification requirements for valve assemblies
2011-07-01
DL/T 2025.2-2019
电站阀门检修导则 第2部分 蝶阀
Guide for the maintenance of power plant valve-Part 2: Butterfly valve
2019-06-04
NB/T 20010.2-2010
压水堆核电厂阀门 第2部分:碳素钢铸件技术条件
PWR nuclear power plant valve—Part 2:Specification of carbon steel casting
2010-05-24
NB/T 20010.6-2010
压水堆核电厂阀门 第6部分:紧固件技术条件
PWR nuclear power plant valve—Part 6:Specification for fastener
2010-05-24
NB/T 20010.11-2010
压水堆核电厂阀门 第11部分:电动装置
PWR nuclear power plant valve—Part 11:Electric actuator
2010-05-24
NB/T 20010.12-2010
压水堆核电厂阀门 第12部分:气动装置
PWR nuclear power plant valve—Part 12:Pneumatic actuator
2010-05-24
NB/T 20078-2012
压水堆核电厂安全级气动调节阀鉴定规程
Qualification procedure for safety-related pneumatic control valve of pressurized water reactor nuclear power plants
2012-01-06
NB/T 20010.8-2010
压水堆核电厂阀门 第8部分:安装和维修技术要求
PWR nuclear power plant valve—Part 8:Specification of installation and maintenance
2010-05-24
NB/T 20010.1-2010
压水堆核电厂阀门 第1部分:设计制造通则
PWR nuclear power plant valve—Part 1:General standard for design and manufacture
2010-05-24
NB/T 20010.14-2010
压水堆核电厂阀门 第14部分:柔性石墨填料技术条件
PWR nuclear power plant valve—Part 14:Specification of flexible graphite packing
2010-05-24
NB/T 20010.9-2010
压水堆核电厂阀门 第9部分:产品出厂检查与试验
PWR nuclear power plant valve—Part 9:Final examination and test in manufactory
2010-05-24