YD/T 3707-2020
基于LTE的车联网无线通信技术 网络层技术要求
Technical requirements of network layer of LTE-based vehicular communication
2020-04-16
YD/T 3592-2019
基于LTE的车联网无线通信技术 基站设备技术要求
The eNodeB equipment technical requirements of vehicular communication based on LTE
2019-11-11
YD/T 2621-2013
演进的移动分组核心网络(EPC)策略和计费规则功能设备技术要求
The technical requirement for PCRF equipment in evolved packet core network
2013-10-17
YD/T 1797-2008
2GHz TD-SCDMA数字蜂窝移动通信网 多媒体广播系统核心网设备技术要求(第一阶段)
Technical Requirements for Core Network Equipment for 2GHz TD-SCDMA Digital Cellular Mobile Communication Network MBMS System(Phase 1)
2008-04-15
YD/T 1984-2009
移动通信网IMS系统设备技术要求
Technical requirements for IMS system equipments in mobile communication network
2009-12-11
YD/T 1410-2007
2GHz TD-SCDMA/WCDMA 数字蜂窝移动通信网核心网设备技术要求(第一阶段)
Technical Specification for 2GHz TD-SCDMA/WCDMA Digital Cellular Mobile Communication Network Core Network Equipment (Phase Ⅰ)
2007-05-15
YD/T 1427-2005
900/1800MHz TDMA数字蜂窝移动通信网智能外设(IP)设备技术要求(CAMEL3)
Technical requirements for digital cellular communication network equipment Intelligent Peripheral (IP) (CAMEL3)
2005-12-26
YD/T 2628.2-2015
演进的移动分组核心网络(EPC)设备技术要求 第2部分:支持CDMA接入
Equipment technical requirement for evolved mobile packet core(EPC) network Part 2: CDMA access
2015-07-14
YD/T 1426-2005
900/1800MHz TDMA数字蜂窝移动通信网业务管理点(SMP)设备技术要求(CAMEL3)
Technical requirements for digital cellular communication network equipment Service Management Point (SMP) (CAMEL3)
2005-12-26
YD/T 1425-2005
900/1800MHz TDMA数字蜂窝移动通信网业务控制点(SCP)设备技术要求(CAMEL3)
Technical requirements for digital cellular communication network equipment Service Control Point (SCP) (CAMEL3)
2005-12-26
YD/T 1365-2006
2GHz TD-SCDMA数字蜂窝移动通信网 无线接入网络设备技术要求
Technical requirements for RAN equipment of 2GHz TD-SCDMA digital cellular mobile communication network
2006-01-20
GB/T 39845-2021
基于LTE技术的宽带集群通信(B-TrunC)系统 网络设备技术要求(第一阶段)
LTE-based broadband trunking communication(B-TrunC) system—Technical requirements for network equipments(Phase 1)
2021-03-09
GB/T 37289-2019
基于LTE技术的宽带集群通信(B-TrunC)系统 接口技术要求(第一阶段) 终端到集群核心网接口
LTE based Broadband Trunking Communication(B-TrunC)system—Technical requirements for interface(Phase 1)—Interface between UE and trunking core network
2019-03-25
YD/T 1424.1-2005
900/18OOMHz TDMA数字蜂窝移动通信网业务交换点(SSP)设备技术要求(CAMEL3)第1部分:电路域(CS)
Technical requirements for digital cellular communication network equipment Service Switch Point (SSP) (CAMEL3) -- CS domain part
2005-12-26
YD/T 1424.2-2005
900/1800MHz TDMA数字蜂窝移动通信网业务交换点(SSP)设备技术要求(CAMEL3) 第2部分:分组域(PS)
Technical requirements for digital cellular communication network equipment Service Switch Point (SSP) (CAMEL3) -- PS domain part
2005-12-26
YD/T 2202-2011
800MHz/2GHz cdma2000数字蜂窝移动通信网 高速分组数据(HRPD)(第三阶段)设备技术要求 接入网(AN)
Technical Requirement for 800MHz/2GHz cdma2000 digital cellular mobile communication network - High rate packet data (Phase 3)equipment - Access network (AN)
2011-05-18
GB/T 37287-2019
基于LTE技术的宽带集群通信(B-TrunC)系统 接口技术要求(第一阶段) 集群核心网到调度台接口
LTE based Broadband Trunking Communication(B-TrunC) system—Technical requirements for interface(Phase 1)—Interface between trunking core network and dispach console
2019-03-25
YD/T 1783-2008
2GHz TD-SCDMA数字蜂窝移动通信网 多媒体广播系统 终端设备技术要求(第一阶段)
Technical Requirements for User Equipment of 2GHz TD-SCDMA Digital Cellular Mobile Communication Network MBMS System (Phase 1)
2008-03-28
YD/T 2217-2011
2GHz WCDMA数字蜂窝移动通信网 终端设备技术要求(第四阶段) 高速分组接入(HSPA)
Technical requirements for 2GHz WCDMA digital cellular mobile communication network user equipment (phase 4) - high speed packet access (HSPA)
2011-05-18
YD/T 1679-2013
800MHz/2GHz cdma2000数字蜂窝移动通信网设备技术要求 高速分组数据(HRPD)(第二阶段)接入终端(AT)
Technical requirement for 800MHz/2GHz cdma2000 digital cellular mobile communication network equipment - High rate packet data (Phase 2)—Access terminal
2013-04-25