压水堆核电厂安全壳永久性仪表系统的安装和试验技术规程
Technical specification for installation and test of containment instrumentation system of PWR nuclear power plants
2015-07-01
EJ/T 1115-2000
压水堆核电厂反应堆低功率物理试验
Physics tests at low power for PWR nuclear power plant
2001-02-28
EJ/T 1114-2000
压水堆核电厂反应堆首次装料试验
Initial loading test for PWR nuclear power plant
2001-02-28
NB/T 20482-2018
压水堆核电厂钢制安全壳设计建造规范
Specification for design and construction of steel containment vessel of nuclear power plant of PWR
2018-03-22
NB/T 20095-2012
压水堆核电厂安全壳外供暖、通风、空调系统设计准则
Design criteria for HVAC systems located outside containment of PWR nuclear power plant
2012-01-06
NB/T 20325.4-2018
压水堆核电厂安全壳预应力技术规程 第4部分:监测
Prestressing technology specification for safety containments of PWR nuclear power plants-Part4:Monitoring
2018-03-22
NB/T 20391-2016
压水堆核电厂钢制安全壳组装、安装及验收技术规程
PWR nuclear power plant steel containment vessel assembly、 installation and acceptance specification
2016-02-05
NB/T 20459-2017
非能动压水堆核电厂钢制安全壳底封头灌浆技术规程
Technical specification for steel containment vessel bottom head grouting in passive PWR nuclear power plant
2017-04-01
NB/T 20010.9-2010
压水堆核电厂阀门 第9部分:产品出厂检查与试验
PWR nuclear power plant valve—Part 9:Final examination and test in manufactory
2010-05-24
NB/T 20316-2014
压水堆核电厂装料前热态性能试验要求
Requirements for hot functional tests before core loading for PWR nuclear power plants
2014-10-15
EJ/T 1228-2008
压水堆核电厂控制棒驱动线热态试验要求
Experiment demand for thermal tests on control rod drive line of PWR nuclear power plant
2008-03-17
NB/T 20345-2015
压水堆核电厂燃料破损啜吸装置安装与试验技术规程
Technical specification for installation and test of faulted fuel sipping device in PWR nuclear power plants
2015-07-01
CSA N287.6-22
Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants
核电厂混凝土安全壳结构的运行前验证和泄漏率试验要求
2022-01-07
CSA N287.7-17(R2022)
In-Service Examination and Testing Requirements for Concrete Containment Structures for Nuclear Power Plants, Includes Errata (2018) and Errata (2022)
核电站混凝土安全壳结构在役检查和测试要求 包括勘误表(2018年)