压水堆核电厂核岛阀门通用安装技术规程
General technical regulation of safety-related valves installation in PWR nuclear power plant
2012-01-06
NB/T 20376-2016
压水堆核电厂核岛超级管道安装及验收技术规程
Installation and acceptance regulation for nuclear island main steam superpiping of PWR nuclear power plant
2016-02-05
NB/T 20397-2017
压水堆核电厂核岛管道支吊架预制及安装技术规程
Technical regulations for the prefabrication and installation of piping supports and-hangers in pressurized water reactor nuclear power plants
2017-02-10
NB/T 20114-2012
压水堆核电厂棒电源系统安装技术规程
The technical regulation of pressurized water reactor CRDW power supply system installlation
2012-01-06
NB/T 20304-2014
压水堆核电厂反应堆保护系统安装技术规程
Technical guideline for installation of reactor protection system of pressured water reactor nuclear power plants
2014-06-29
NB/T 20110-2012
压水堆核电厂核辅助系统设备安装技术规程
Technical regulation for installation of PWR nuclear power auxiliary system equipment
2012-01-06
NB/T 20021-2010
压水堆核电厂核岛混凝土筏形基础施工技术规程
Construction technology specification for concrete raft foundation of nuclear island of PWR nuclear power plant
2010-05-24
NB/T 20126-2023
压水堆核电厂核岛厂房嵌缝施工及验收技术规程
2023-05-26
NB/T 20216-2024
压水堆核电厂核辅助系统管道安装技术规程
2024-09-24
NB/T 20371-2016
压水堆核电厂稳压器安装技术规程
Specification for pressurizer installation in PWR nuclear power plant
2016-02-05
NB/T 20044-2021
压水堆核电厂堆内构件安装及验收技术规程
2021-04-26
NB/T 20664-2023
压水堆核电厂核岛冷源系统调试技术导则
2023-05-26
NB/T 20353-2015
压水堆核电厂松动部件与振动监测系统安装技术规程
Erection technical regulations for loose parts and vibration monitoring system for PWR nuclear power plants
2015-07-01
NB/T 20500-2018
压水堆核电厂管道保温安装及验收技术规程
Technical specification for erection and acceptance of pipe insulation in PWR nuclear power plants
2018-03-22
NB/T 20390-2016
压水堆核电厂机械模块安装及验收技术规程
Technical regulation for construction and acceptance of mechanical module installation in PWR nuclear power plant
2016-02-05
NB/T 20672-2023
压水堆核电厂蒸汽发生器安装技术规程
2023-05-26
NB/T 20661-2023
压水堆核电厂反应堆压力容器安装技术规程
2023-05-26
NB/T 20129-2023
压水堆核电厂核岛应急柴油发电机组的安装、试验与验收技术规程
2023-10-11
NB/T 20175-2012
压水堆核电厂燃料操作与贮存系统安装及验收技术规程
Requirements for installation and acceptance of fuel handling and storage system at PWR plant