水电水利基本建设工程 单元工程质量等级评定标准 第6部分:升压变电电气设备安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering. Part 6:Step-up substation electrical equipment installation engineering
2012-01-04
SL 639-2013
水利水电工程单元工程施工质量验收评定标准——升压变电电气设备安装工程
Inspection and assessment standard for separated item project construction quality of water conservancy and hydroelectric engineering -- Installation of Step-up substation electrical equipment
2013-08-08
DL/T 5113.5-2012
水电水利基本建设工程 单元工程质量等级评定标准 第5部分:发电电气设备安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 5:Electric generation equipment installation enginering
2012-01-04
DL/T 5113.4-2012
水电水利基本建设工程 单元工程质量等级评定标准 第4部分:水力机械辅助设备安装工程(附条文说明)
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 4:Auxiliary equipment of hydraulic machinery installation engineering