CECS 158-2015
膜结构技术规程(附条文说明)
Technical specification for membrane structures
GB/T 20042.2-2023
质子交换膜燃料电池 第2部分:电池堆通用技术条件
Proton exchange membrane fuel cell—Part 2: General technical specification of fuel cell stacks
2023-03-17
GB/T 37244-2018
质子交换膜燃料电池汽车用燃料 氢气
Fuel specification for proton exchange membrane fuel cell vehicles—Hydrogen
2018-12-28
LY/T 2271-2014
造林树种与造林模式数据库结构规范
Specification for afforestation species and afforestion models database structure
2014-08-21
SL 157-2010
掺气减蚀模型试验规程(附条文说明)
Specification for hydraulic model test on flow aeration and erosion reduction of discharge structure
2010-10-11
ASTM D7174-05(2022)
Standard Specification for Preformed Closed-Cell Polyolefin Expansion Joint Fillers for Concrete Paving and Structural Construction
混凝土铺路和结构施工用预制闭孔聚烯烃伸缩缝填料的标准规范
2022-06-01
DL/T 286-2012
发电厂循环水系统进水流道水力模型试验规程
Specification for hydraulic model test of pump intake structures of nuclear of fossil fuel power plants
2012-01-04
YD/T 1863.1-2009
2GHz WCDMA数字蜂窝移动通信网 高速下行分组接入(HSDPA)网络管理技术要求 第1部分:配置网络资源模型
2GHz WCDMA Digital Cell Mobile Communications Network HSDPA Management Technical Specification Part 1:Configuration Network Resource Model
2009-06-15
YD/T 1863.2-2009
2GHz WCDMA数字蜂窝移动通信网 高速下行分组接入(HSDPA)网络管理技术要求 第2部分:性能网络资源模型
2GHz WCDMA Digital Cell Mobile Communications Network HSDPA Management Technical Specification Part 2:Performance Network Resource Model
2009-06-15
YD/T 2333.1-2011
2GHz TD-SCDMA/WCDMA数字蜂窝移动通信网演进版高速分组接入(HSPA+)网络管理技术要求 第1部分:信息模型
2GHz TD-SCDMA/WCDMA digital cell mobile communications network HSPA+ management technical specification--Part 1:information model
2011-12-20
ASTM D8139-23
Standard Specification for Semi-Rigid, Closed-Cell Polypropylene Foam, Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction
混凝土铺砌和结构施工用半刚性闭孔聚丙烯泡沫预制膨胀节填料的标准规范
2023-12-01
YD/T 1587.2-2007
2GHz cdma2000数字蜂窝移动通信网网络管理技术要求(第一阶段) 第2部分 性能网络资源模型
Technical Specification for 2GHz cdma2000 Digital Cell Mobile Communication Network Management (Phase Ⅰ)Part 2 Performance Network Resoure Model
2007-05-16
YD/T 1587.1-2007
2GHz cdma2000数字蜂窝移动通信网网络管理技术要求(第一阶段) 第1部分 配置网络资源模型
Technical Specification for 2GHz cdma2000 Digital Cell Mobile Communication Network Management (Phase Ⅰ)Part 1 Configuration Network Resource Model
2007-05-15
YD/T 1878.2-2009
800MHz/2GHz cdma2000数字蜂窝移动通信网高速分组数据(HRPD)网络管理技术要求 第2部分:性能网络资源模型
800MHz/2GHz cdma2000 Digital Cell Mobile Communications Network(HRPD)Network Management Technical Specification Part 2:Performance Network Resource Model
2009-06-15
YD/T 1585.1-2013
2GHz TD-SCDMA数字蜂窝移动通信网网络管理接口技术要求(第二阶段) 第1部分:网络资源模型
2GHz TD-SCDMA digital cell mobile communications network management interface technical specification (Phase Ⅱ) Part 1 network resource model
2013-04-25
YD/T 1863.3-2009
2GHz WCDMA数字蜂窝移动通信网 高速下行分组接入(HSDPA)网络管理技术要求 第3部分:基于 CORBA技术的网络资源模型设计
2GHz WCDMA Digital Cell Mobile Communications Network HSDPA Management Technical Specification Part 3:CORBA Based Network Resource Model Design
2009-06-15
YD/T 1878.1-2009
800MHz/2GHz cdma2000数字蜂窝移动通信网高速分组数据(HRPD)网络管理技术要求 第1部分:配置网络资源模型
800MHz/2GHz cdma2000 Digital Cell Mobile Communications Network(HRPD)Network Management Technical Specification Part 1:Configuration Network Resource Model
2009-06-15
YD/T 1587.3-2007
2GHz cdma2000数字蜂窝移动通信网网络管理技术要求(第一阶段) 第3部分 基于CORBA技术的网络资源模型设计
Technical Specification for 2GHz cdma2000 Digital Cell Mobile Communication Network Management (Phase Ⅰ)Part 3 CORBA Based Network Resource Model Design
2007-05-15
YD/T 2333.2-2011
2GHz TD-SCDMA/WCDMA数字蜂窝移动通信网演进版高速分组接入(HSPA+)网络管理技术要求 第2部分:基于CORBA技术的网络资源模型设计
2GHz TD-SCDMA/WCDMA digital cell mobile communications network HSPA+ management technical specification part 2: CORBA based information model design
2011-12-20
YD/T 1585.3-2013
2GHz TD-SCDMA 数字蜂窝移动通信网网络管理接口技术要求(第二阶段)第3部分:基于CORBA技术的信息模型设计
2GHz TD-SCDMA digital cell mobile communications network management interface technical specification (Phase Ⅱ) Part 3 CORBA-based information model design
2013-04-25