压水堆核电厂阀门 第7部分:包装、运输和贮存
PWR nuclear power plant valve—Part 7:Specification of packaging,transport and storage
2010-05-24
NB/T 20141-2012
压水堆核电厂新燃料组件包装、运输、装卸和贮存规定
Packaging,transportation,loading & unloading and storage of fresh fuel assembly for PWR nuclear power plant
2012-01-06
NB/T 20232-2013
压水堆核电厂燃料装卸和贮存系统设计准则
Design criteria for fuel handling and storage sysgems of pressurized water reactor nuclear power plants
2013-06-08
T/JSVIA 004-2024
压水堆核电厂阀门 清洁和防污染
2024-12-16
NB/T 20010.8-2010
压水堆核电厂阀门 第8部分:安装和维修技术要求
PWR nuclear power plant valve—Part 8:Specification of installation and maintenance
2010-05-24
NB/T 20010.10-2010
压水堆核电厂阀门 第10部分:应力分析和抗震分析
PWR nuclear power plant valve—Part 14:Stress analysis and seismic analysis
2010-05-24
NB/T 20162-2012
压水堆核电厂核岛机械设备在贮存、安装和启动期间清洁区的建立和维护技术规程
Technical requirements on the cleaning areas establishment and maintenance of PWR nuclear island equipment during storage,installation and start-up