作废 EJ/T 1022.8-1996
压水堆核电厂阀门 安装和维修技术要求 压水堆核电厂阀门 安装和维修技术要求
发布日期:1996-04-18
实施日期:1996-08-01
分类信息
标准简介
相似标准/计划/法规
NB/T 20010.8-2010
压水堆核电厂阀门 第8部分:安装和维修技术要求
PWR nuclear power plant valve—Part 8:Specification of installation and maintenance
2010-05-24
NB/T 20111-2012
压水堆核电厂核岛阀门通用安装技术规程
General technical regulation of safety-related valves installation in PWR nuclear power plant
2012-01-06
NB/T 20127-2019
压水堆核电厂预埋件制作与安装技术要求
NB/T 20064-2012
压水堆核电厂反应堆堆芯仪表系统安装和试验要求
Installation and test requirement of in-core instrumentation system in pressured water reactor nuclear power plant
2012-01-06
NB 10666
压水堆核电厂仪表和控制设备的接地和屏蔽技术要求
2021-04-26
NB/T 20575-2019
压水堆核电厂2、3级热交换器管子管板焊缝维修技术要求
NB/T 20341-2015
压水堆核电厂核岛厂房用孔洞封堵材料和嵌缝材料技术要求
Technical specification for nuclear island building hole blocking material and caulking material of PWR nuclear power plants
2015-04-02
NB/T 20348-2015
压水堆核电厂安全壳永久性仪表系统的安装和试验技术规程
Technical specification for installation and test of containment instrumentation system of PWR nuclear power plants
2015-07-01
NB/T 20162-2012
压水堆核电厂核岛机械设备在贮存、安装和启动期间清洁区的建立和维护技术规程
Technical requirements on the cleaning areas establishment and maintenance of PWR nuclear island equipment during storage,installation and start-up
2012-10-19
NB/T 20560.5-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第5部分:碎渣压降试验技术要求
2021-04-26
NB/T 20560.3-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第3部分:上游分析技术要求
Design and performance evaluation of emergency core cooling stainer for pressurized water reactors nuclear power plants—Part 3: Technical requirements for upstream effects analysis
2021-04-26
NB/T 20560.4-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第4部分:设备设计技术要求
2021-12-22
NB/T 20560.7-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第7部分:下游效应(堆芯内)试验技术要求
Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant—Part 7: Technical requirements for downstream(in-vessel) effects test
2021-04-26
NB/T 20560.8-2023
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第8部分:下游效应(堆芯外)分析技术要求
2023-05-26
NB/T 20560.6-2019
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第6部分:化学效应试验技术要求
NB/T 20560.2-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第2部分:碎渣源项踏勘技术要求
2021-04-26
阀门核电厂安装维修压水堆

最后更新时间 2025-08-29