UNE 16564-1-1997
BENDING PIPE TOOLS. PART 1: SPRING TUBE BENDER. CLASSIFICATION, TECHNIcs specifications and tests.
弯管工具 第1部分:弹簧弯管机 分类、工艺规范和试验
1997-04-24
UNE 16564-2-1997
BENDING PIPE TOOLS. PART 2: NIPPER TUBE BENDER. CLASSIFICATION, TECHNIcal specifications, test and marking.
弯管工具 第2部分:钳式弯管机 分类、技术规范、试验和标记
1997-11-20
DIN 4930
Pipes for use in freezing shaft sinking - Dimensions and technical delivery conditions
冻结凿井用管道.尺寸和交货技术条件
2016-10-01
DIN 17671
Wrought copper alloys - tubes of brass pipe - technical delivery conditions
锻铜合金.黄铜管.交货技术条件
1957-04-01
UNE-EN 10208-1-1998
STEEL PIPES FOR PIPELINES FOR COMBUSTIBLE FLUIDS. TECHNICAL DELIVERY CONDITIONS. PART 1: PIPES OF REQUIREMENT CLASS A.
可燃液体管道用钢管 技术交付条件 第1部分:要求A级的管道
1998-09-23
DIN Handbook 15/2
Steel Pipelines - Standards dealing with technical delivery conditions for steel pipes and tubes
钢管.钢管和钢管交货技术条件标准
2009-10-01
DIN V 16878
Pipes and fittings of polypropylene (PP) for buried ducting - Dimensions and technical delivery conditions
埋地管道用聚丙烯(PP)管和配件.尺寸和交货技术条件
2002-11-01
DIN V 16877
Pipes and fittings of polypropylene (PP) for cable ducting - Dimensions and technical delivery conditions
电缆管道用聚丙烯(PP)管和配件.尺寸和交货技术条件
2002-11-01
MT/T 720-1997
瓦斯抽放管路自动阻爆灭火装置技术条件
Technical conditions of automatic preventing explosion and extinguish device for the gas drainage piping
1997-12-30
GOST R 55430-2013
Соединения трубопроводов разъемные. Оценка технического состояния и методы испытаний. Безопасность эксплуатации
可拆卸管接头 技术条件和测试方法评估 操作安全
UNE-EN 10208-2-1996
STEEL PIPES FOR PIPELINES FOR COMBUSTIBLE FLUIDS. TECHNICAL DELIVERY CONDITIONS. PART 2: PIPES OF REQUIREMENT CLASS B.
可燃液体管道用钢管 技术交付条件 第2部分:B级要求的管道
1996-12-30
DIN 2874
Flanged steel pipes and flanged steel or cast iron pipes and fittings with PTFE or PFA linings - Technical delivery conditions
内衬PTFE或PFA的钢法兰管及钢和铸铁法兰配件.技术规范
2002-06-01
DIN 2875
Flanged steel pipes and fittings with hard or soft rubber linings - Technical delivery conditions
带硬或软橡胶衬里的法兰钢管和配件.交货技术条件
2002-06-01
DIN 17671-DRAFT
Draft Document - Wrought copper alloys - tubes of brass pipe - technical delivery conditions
文件草案.锻铜合金.黄铜管.交货技术条件
1955-06-01
DIN 16878
Pipes and fittings of polypropylene (PP) for buried cable ducting - Dimensions and technical delivery conditions
埋地电缆管道用聚丙烯(PP)管和配件.尺寸和交货技术条件
2017-07-01
NB/T 11434.2-2023
煤矿膏体充填 第2部分:管阀通用技术条件
Paste filling in coal mine—Part 2:General technical conditions of pipe valves
2023-12-28
SY/T 0460-2018
天然气净化装置设备与管道安装工程施工技术规范(附条文说明)
Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
2018-10-29
BS 08/30182454 DC
BS EN 10208-1. Steel pipes for pipelines for combustible fluids. Technical delivery conditions. Part 1. Pipes of requirement class A
英国标准EN 10208-1 可燃液体管道用钢管 技术交付条件 第一部分 A级管道要求
2008-07-31
DIN 21057-11
Pipe classes for process plants - Part 11: Technical delivery conditions for pipe components of austenitic stainless steels of material group 8.1
工艺设备用管道等级第11部分:材料组8.1奥氏体不锈钢管道部件的交货技术条件
2017-04-01
DIN 21057-5
Pipe classes for process plants - Part 5: Technical delivery conditions for tube parts - Reinforced nozzles
工艺设备用管道等级第5部分:管道部件的交货技术条件加强型喷嘴
2016-12-01