JB/T 8953.2-1999
燃气--蒸汽联合循环设备采购 汽轮机
Steam turbine procurement for combined-cycle plants
1999-08-06
JB/T 8953.1-1999
燃气--蒸汽联合循环设备采购 基本信息
Basic procurement information for combined-cycle plants
1999-08-06
DL/T 5174-2020
燃气-蒸汽联合循环电厂设计规范
Code for design of combined-cycle power plant
2020-10-23
DL/T 851-2004
联合循环发电机组验收试验
Acceptance tests for combined-cycle power plants
2004-03-09
GB/T 18929-2002
联合循环发电装置 验收试验
Acceptance tests for combined-cycle power plants
2002-12-31
ASME PTC 47-2020
Integrated Gasification Combined Cycle Power Generation Plants
综合气化联合循环发电厂
2021-07-23
DL/T 1717-2017
燃气-蒸汽联合循环发电厂化学监督技术导则
Guideline of chemical supervision for combined-cycle power plants
2017-08-02
BS 97/710296 DC
Gas turbines. Procurement. Part 6. Combined cycles (ISO 3977-6)
燃气轮机 采购第六部分 联合循环(ISO 3977-6)
1997-06-20
ASME PTC 47.4-2015(R2020)
Power Block of an Integrated Gasification Combined Cycle Power Plant
一体化气化联合循环发电厂的动力块
2015-12-07
ASME PTC 47.2-2019
Gasification Block of an Integrated Gasification Combined Cycle Power Plant
一体化气化联合循环发电厂的气化块
2020-10-23
ASME PTC 47.3-2021
Syngas-Conditioning Block of an Integrated Gasification Combined Cycle Power Plant
综合气化联合循环发电厂合成气调节块
2022-05-31
BS ISO 18888-2017
Gas turbine combined cycle power plants. Thermal performance tests
燃气轮机联合循环发电厂 热性能测试
2017-11-03
DL/T 2273-2021
联合循环电站燃气轮机技术监督规程
Technical supervision codes for gas turbine in combined cycle power plant
2021-04-26
GB/T 43318-2023
燃气轮机联合循环电站 热力性能试验
Gas turbine combined cycle power plants—Thermal performance tests
2023-11-27
ISO 18888-2017
Gas turbine combined cycle power plants — Thermal performance tests
燃气轮机联合循环发电厂 - 热性能测试
2017-10-19
ASME PTC 47.1-2017(R2022)
Cryogenic Air Separation Unit of an Integrated Gasification Combined Cycle Power Plant
一体化气化联合循环电厂低温空分装置
2018-05-31
DL/T 1224-2013
单轴燃气蒸汽联合循环机组性能验收试验规程
Performance acceptance test code for single shaft combined cycle power plant
2013-03-07
GOST R 55603-2013
Котлы паровые утилизаторы парогазовых установок. Типы и основные параметры
联合循环设备热回收蒸汽发生器 类型和基本参数
YB/T 4504-2016
钢铁企业煤气-蒸汽联合循环电厂设计规范(附条文说明)
Code for design of gas-steam combined cycle power plant of iron and steel enterprises
2016-01-15
DL/T 1605-2016
联合循环电站气态燃料热值、压缩系数和相对密度的计算方法
Calculation of heat value,compression factor,and relative density of gaseous fuels used in combined cycle power plant
2016-08-16