压水堆核电厂安全壳密封性试验
Containment leaktightness test for PWR nuclear power plants
2021-01-07
EJ/T 1114-2000
压水堆核电厂反应堆首次装料试验
Initial loading test for PWR nuclear power plant
2001-02-28
NB/T 10598-2021
压水堆核电厂常规岛低压成套开关设备和控制设备技术条件
Specification for low-voltage switchgear and controlgear assemblies in conventional island of PWR nuclear power plant
2021-01-07
NB/T 20010.9-2010
压水堆核电厂阀门 第9部分:产品出厂检查与试验
PWR nuclear power plant valve—Part 9:Final examination and test in manufactory
2010-05-24
NB/T 20348-2015
压水堆核电厂安全壳永久性仪表系统的安装和试验技术规程
Technical specification for installation and test of containment instrumentation system of PWR nuclear power plants
2015-07-01
NB/T 20316-2014
压水堆核电厂装料前热态性能试验要求
Requirements for hot functional tests before core loading for PWR nuclear power plants
2014-10-15
EJ/T 1228-2008
压水堆核电厂控制棒驱动线热态试验要求
Experiment demand for thermal tests on control rod drive line of PWR nuclear power plant
2008-03-17
NB/T 20345-2015
压水堆核电厂燃料破损啜吸装置安装与试验技术规程
Technical specification for installation and test of faulted fuel sipping device in PWR nuclear power plants
2015-07-01
NB/T 20004-2014
核电厂核岛机械设备材料理化检验方法
Physical and chemical test methods for materials used in nuclear island components of nuclear power plants
2014-06-29
NB/T 20435-2017
压水堆核电厂反应堆调试启动堆芯物理试验
Physics tests for pressurized water reactor of nuclear power plants commissioning startup
2017-04-01
NB/T 20240-2013
压水堆核电厂重新装料后的物理启动试验
Reload startup physics tests for pressurized water reactors of nuclear power
plant
2013-06-08
NB/T 20005.8-2012
压水堆核电厂用碳钢和低合金钢 第8部分:S1、S2级支承件用钢板、型钢和钢棒
Carbon steel and low alloy steel for PWR nuclear power plant-Part 8:Steel plates,beams and bars for class S1 and S2 supports