IEC 62586-1-2017
Power quality measurement in power supply systems - Part 1: Power quality instruments (PQI)
电源系统中的电能质量测量 - 第1部分:电能质量仪器(Pqi)
2017-05-23
BS EN 62586-1-2017
Power quality measurement in power supply systems-Power quality instruments (PQI)
供电系统中的电能质量测量
2017-12-07
IEC TS 62586-3-2025
Power quality measurement in power supply systems - Part 3: Maintenance tests, calibration
供电系统电能质量测量 第3部分:维护试验、校准
2025-08-08
IEC 62586-2-2017/AMD1-2021
Amendment 1 - Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements
修改件1.供电系统中的电能质量测量.第2部分:功能试验和不确定度要求
2021-09-15
BS EN 62586-2-2017+A1-2021
Power quality measurement in power supply systems-Functional tests and uncertainty requirements
供电系统中的电能质量测量
2022-03-15
GB/T 39853.2-2021
供电系统中的电能质量测量 第2部分:功能试验和不确定度要求
Power quality measurement in power supply systems—Part 2: Functional tests and uncertainty requirements
2021-03-09
IEC 62586-2-2017
Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements
电源系统中的电能质量测量 - 第2部分:功能测试和不确定性要求
2017-03-07
IEC 62586-2-2017+AMD1-2021 CSV
Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements
供电系统中的电能质量测量.第2部分:功能试验和不确定度要求
2021-09-15
TB/T 2993.1-2016
铁路通信电源 第1部分:通信电源系统总技术要求
Railway communication power supply-Part 1:General requirements of power supply system for communication
2016-11-18
GB/T 44185.1-2024
港口岸电系统建设导则 第1部分:电网侧
Guidelines for construction of shore-to-ship power supply system—Part 1: Power grid side
2024-07-24
DL/T 2151.1-2020
岸基供电系统 第1部分:通用要求
Shore-based power supply systems-Part 1: General requirements
2020-10-23
DL/T 836.1-2016
供电系统供电可靠性评价规程 第1部分:通用要求
Reliability evaluation code in power supply system Part 1:General rule
2016-01-07
BS 03/315064 DC
IEC 60050-615 ED.1. International Electrotechnical Vocabulary. Part 615. Electric power system. Quality of supply
IEC 60050-615第1版 国际电工词汇 第615部分 电力系统 供应质量
2003-10-20
DIN EN 62586-2/A1-DRAFT
Draft Document - Power quality measurement in power supply systems - Part 2: Functional tests and uncertainty requirements (IEC 85/700/CD:2019); Text in German and English
文件草案——供电系统中的电能质量测量——第2部分:功能试验和不确定度要求(IEC 85/700/CD:2019);德语和英语文本
2019-12-01
IEC/IEEE 60255-118-1-2018
Measuring relays and protection equipment - Part 118-1: Synchrophasor for power systems - Measurements
测量继电器和保护设备.第118-1部分:电力系统用同步相器.测量
2018-12-17
GB/T 36028.1-2018e
靠港船舶岸电系统技术条件 第1部分:高压供电
Shore-to-ship power supply system technical conditions—Part 1:High voltage connection
2018-03-15
GB/T 36028.1-2018
靠港船舶岸电系统技术条件 第1部分:高压供电
Shore-to-ship power supply system technical conditions—Part 1: High voltage connection
2018-03-15
UNE-EN 60870-2-1-1997
TELECONTROL EQUIPMENT AND SYSTEMS. PART 2: OPERATING CONDITIONS. SECTIon 1: Power supply and electromagnetic compabitibility.
遥控设备和系统 第2部分:操作条件 第1节:电源和电磁兼容性
1997-06-24
KS C IEC 60870-2-1(2018 Confirm)
원격 제어 장치 및 시스템-제2부:작동 조건-제1절:전원 및 전기 자기 적합성
远动设备和系统第2部分:工作条件第1节:电源和电磁兼容性
2003-11-03
KS C IEC 60870-2-1(2023 Confirm)
원격 제어 장치 및 시스템-제2부:작동 조건-제1절:전원 및 전기 자기 적합성
遥控设备和系统第2部分:工作条件第1节:电源和电磁兼容性
2003-11-03